Planning an office relocation: a 10-step guide
An office move goes smoothly when the decisions are made in the right order. These ten steps run from the first look at your lease to the first Monday in the new space.

Steps 1 and 2: read the lease, then set the brief
Step one is paperwork. Find your current lease and read the break clause, the notice period and the conditions for handing the space back. Many leases require the office to be returned clean and in its original layout, and that can mean removing partitions or cabling. Knowing this early tells you how much time and money the old premises will still ask of you after the move.
Step two is a one-page brief. Write down why you are moving, how many people will work there on a typical week, which of them come in every day and which come in two or three days, and what the new space must have, such as step-free access, parking, meeting rooms or a loading bay.
The brief stops the project drifting. When someone later suggests a nicer building across town, you can test it against the same page. Keep it short enough that everyone reads it, and share it with the directors, the office manager and whoever deals with IT.
Steps 3 and 4: choose the premises and agree the date
Step three is the building. Visit at the time of day your staff will arrive, check the commute from the bus and rail routes they actually use, and look closely at loading access. A beautiful unit with a narrow staircase and a single small lift can double the carrying time on moving day.
Step four is the date, and it is worth working backwards from it. Count the weeks needed for broadband installation, fit-out, notice to your current landlord and notice to your own customers. Most offices need at least two to three months from signing a new lease to a calm move, and longer if there is building work.
Pick a date that suits your trade rather than the removals calendar. A Friday evening finish with a Monday restart is common, and a quiet fortnight in the business year is better still. Our guide to minimising business disruption covers how to choose that window.
Step 5: take stock and cut before you pack
Step five is the most rewarding job on the list. Walk through every room with a clipboard and sort what you own into keep, sell, donate, recycle and bin. Every item you do not move is an item you do not pay to carry, wrap, store or unpack.
Old filing cabinets, broken chairs, unused monitors and boxes of paper from a decade ago are the usual culprits. Records you must retain by law should be identified and kept; the rest can go through confidential shredding. Electrical items should be taken to a recycling route rather than the general bin. BCP Council lists its household recycling centres, and many suppliers of office furniture will take old pieces back when you buy new ones.
Measure the pieces you are keeping, and check them against the new floor plan. A boardroom table that does not fit through the new doorway is much better discovered now than on the day.
Steps 6 and 7: list the people and the technology
Step six is a project team. For a small business that may be you and one colleague; for a larger firm it is a coordinator, an IT lead, a facilities contact and one representative per department. Give each person a task list and a deadline, and agree one place where decisions are recorded.
Step seven is the technology, which is where moves most often go wrong. List every line, number, server, printer, handset, alarm and door entry system. Ask your internet and line providers for their transfer timetable straight away, because new lines often take weeks. Decide what is moved, what is replaced and what is cancelled.
Be honest about what the transport side covers. A removals quote moves furniture and boxes, and nothing in this guide should be read as a promise of specialist IT handling. If you have sensitive equipment, plan for your IT provider or your own staff to disconnect, label and reconnect it, and let your removals request mention that the kit exists.
Step 8: choose how the move will be done
Step eight is deciding the route to a booking. Offices come in two sizes. A very small office, with a few desks, some boxes and a printer, can often be done by a single van, and the man and van route lets you see local drivers near the pickup, their van sizes and an estimated price, then book online with a deposit.
A larger office is a Full Removals quote request. You describe the move, list the bulky items, give an estimate of boxes, say whether you want packing and materials, and add a video walkthrough or photos if you can. The Van Man Co replies with a quote, and nothing is booked until you accept it. Everything for this type of job is explained on our office removals page.
Whichever you choose, tell the quote about the real access at both ends: floors, lifts, stairs, the distance from the van to the door and any restrictions set by the building. Those details change the time a move takes more than the number of desks does.
Step 9: tell everyone and prepare the new space
Step nine is communication and preparation together. Staff need the date, the address, the parking arrangements and a clear sense of what is expected of them. Customers and suppliers need the new address and the switch-over date, and the same details need updating on your website, your Google profile, your bank and the regulators or bodies you report to.
At the new office, check that keys, fobs and alarm codes are ready, that the space is clean and that the layout matches your plan. Number the desks and fix the labels in place a day ahead. Arrange a post redirect with Royal Mail for the old address, because it catches the correspondence that is slowest to update.
Think about parking and access for the van itself. In central Bournemouth some streets are permit-controlled, and BCP Council's contractors parking dispensation for the Bournemouth area is applied for online at least three days ahead.
A realistic timeline from lease to Monday morning
It helps to see the ten steps against a calendar. Three months out, read the lease, write the brief and start looking at premises. Two months out, sign for the new space, give notice on the old one and ask every provider for transfer dates. Six weeks out, start the clear-out, book the move and tell staff and customers.
Four weeks out, order any new furniture, confirm the layout and number the desks. Two weeks out, finish the sort, label the boxes and check access at both ends. In the final week, confirm times, pack the essentials and brief the coordinators.
Treat the dates as a guide rather than a rule, because a small office with four desks can compress them and a large one will stretch them. What matters is that every long-lead item, such as broadband, notice periods and furniture orders, is started early.
Write the timeline on one page and put one name against each line. A plan nobody owns is a plan that slips, and an office move rarely slips quietly.
Mistakes that catch out first-time office movers
A handful of errors turn up again and again. The first is leaving the technology until the last fortnight, when line installation has a lead time that cannot be shortened. The second is underestimating the clear-out, which always takes longer than the move.
The third is giving the quote vague access information. A move from a first-floor unit with a lift is a different job from one with three flights of stairs and a long carry, and the estimate should reflect that. The fourth is forgetting the old landlord's requirements, such as returning the space clean and removing signage, which can run on for days after the keys change hands.
The last is skipping the review. Ten minutes after the move, ask what went well and what did not, and write it down. It is the most useful piece of insight you will get, and it makes the next relocation noticeably shorter.
Step 10: moving day and the week after
Step ten is the day itself. Appoint one coordinator at each end, hold a ten-minute briefing before the first load, and keep a simple checklist of the order in which areas are cleared. Check each room at the old office once it is empty, take dated photographs and return the keys as the lease requires.
At the new office, furniture goes to its marked place before anyone starts unpacking. People then collect their numbered boxes, plug in and work. Keep a single list of faults and missing items so that nothing is lost between conversations.
In the week after, test every handset and printer, confirm the post redirect, update any remaining records and hold a short review. The review is worth writing down. If your business moves again, that note turns a ten-step plan into a shorter, better one. The price section on this page is the place to start your request.